March 2024 Work Party

March 2024

With river levels still very high most of the banks were inaccessible so work was limited to the areas where access was possible - this being from Anjou bridge to approx half way down the field below. Debris was removed from in and around Anjou bridge and the canal section, the fish pass and banks were also inspected. Water is currently flowing heavily around the fish pass.